Northwest Washington · Bathroom Specialists

Bathroom Remodeling in Northwest WA and Beyond

See your actual bathroom redesigned in AI before you spend a dollar. Then get one firm price, a one-page contract, and a single Project Manager with you from first measurement to final walkthrough.

Licensed GC #1STPRPL807JS
$2M Insured
Bonded $30,000
1,100+ Projects Completed
Free AI visualization of your own bathroom, before you sign anything.
Materials sourced and included — you never call a supplier or chase a backorder.
10+ crews running — your project doesn't sit behind someone else's.
We help you get financing, and we work directly with your insurance on covered claims.
GET MY FREE AI ESTIMATE
+1 360-467-8001
Mon–Fri 8am–6pm · Sat–Sun 10am–5pm
Completed bathroom remodeling project
Full bathroom remodel — Northwest Washington
Prefer to see it first? Scroll down for your free AI design and real project photos.
What's Included

Everything Your Bathroom Remodel Covers

No surprises, no change-order games — here's exactly what's built into every project before we ever hand you a price.

Custom Vanity & Storage

We reconfigure your footprint for real storage — single or double vanity, sized to fit your actual space.

Walk-In Showers & Tub Conversions

Frameless glass, built-in niches, and tub-to-shower conversions — sourced, sealed, and installed by licensed trades.

Tile & Waterproofing

Full waterproofing membrane under every shower and floor, then custom tile — built to stop leaks, not just look good.

Plumbing & Fixtures

Toilets, faucets, and valves relocated or upgraded by licensed plumbers — never a surface-level swap over old lines.

Lighting & Ventilation

Vanity lighting, recessed cans, and an upgraded exhaust fan sized to actually clear steam and moisture.

Full Permit & Code Handling

We pull and manage every required permit ourselves — you never have to deal with the city or the paperwork.

What Clients Say

Verified Reviews From Real Clients

Get Inspired

Bathroom Remodeling Ideas

Explore the upgrades our clients love most — mix and match to design a bathroom that fits exactly how you live.

Walk-In Shower Conversion

Replace a tub with a curbless, frameless walk-in shower.

Heated Floors

Radiant in-floor heat for cold mornings, under real tile.

Double Vanity

Two sinks, real counter space, no more morning traffic jam.

Freestanding Soaking Tub

A statement tub as the centerpiece of a spa-style primary bath.

Custom Tile Work

Floor-to-ceiling tile, herringbone floors, feature accent walls.

Built-In Niches & Storage

Recessed shower shelving and vanity storage that clears counters.

Frameless Glass Enclosures

A clean, modern shower line with no metal frame in the way.

Statement Lighting

Backlit mirrors and vanity sconces planned with your layout.

Transparent Pricing

How Much Does a Bathroom Remodel Actually Cost?

Every bathroom is different, so here's a real starting point — not a guessing game. These prices are for the work only. You choose materials separately, in one visit to our showroom.

Tub to Shower

Tub-to-Shower Conversion

A complete shower-area remodel, start to finish — work only, materials chosen separately.

Tub removed, new shower built
Walls, ceiling & flooring
Plumbing & insulation
Work Only · No Materials
From $8,000
Materials purchased separately
Hallway Bathroom

Hallway / Guest / Kids Bath

A full remodel of a guest, hallway or kids bathroom. Work only.

Walls, ceiling & flooring
Plumbing & insulation
Full demo & haul-away
Work Only · No Materials
From $14,000
Materials purchased separately
Master Bathroom — 2

Master Bath, 2 Wet Points

A full master suite with both a shower and a tub. Work only.

Shower AND tub
Walls, ceiling & flooring
Plumbing & insulation
Work Only · No Materials
From $20,000
Materials purchased separately
Materials — Separate & Simple

Choose your materials once, in our showroom.

1
One showroom visit
We book your appointment and send the showroom your dimensions. You choose everything in one visit.
2
Layout & finishes
The showroom builds your layout, and you pick finishes and handles in person.
3
Separate invoice
We invoice you for the materials you chose. Prefer another source? Order them yourself, online or elsewhere.

Wholesale prices on materials. When you buy through us, you get our wholesale pricing — the lowest prices available, close to what the manufacturer charges. We never pick or approve materials at your home.

Every price covers the full remodel work — walls, ceiling, flooring, plumbing and insulation — labor only. Materials are separate. Shower glass and the vanity top are arranged and priced separately. Your final price depends on scope and location.

Your price is locked into the 1-page contract the day you sign — it only changes if you ask for something new, never because of a "surprise" we found later.

5% to Start
Locks in your schedule — not a big deposit upfront
Progress Payments
Tied to real milestones, not a fixed calendar
Balance on Sign-Off
Final payment due only once you approve the finished work
Bathroom remodeling material
Bathroom remodeling material
Bathroom remodeling material
Bathroom remodeling material
Bathroom remodeling material
Bathroom remodeling material
Built to Last

Premium Materials & Fixtures, Sourced and Installed for You

Bathrooms take a daily beating — moisture, heat, constant use. We work with trusted suppliers so every surface and fixture is built for it. Every material is selected, ordered, and tracked by your Project Manager.

Quartz & stone vanity tops (quoted separately)
Custom tile showers & flooring
Freestanding tubs & shower systems
Shower niches, benches & waterproofing
Designer fixtures & hardware
Waterproof flooring, built to code
Radiant heated floor systems
Ventilation & exhaust upgrades
See It Before You Build It

Your Bathroom, Rendered in AI — Free

Before you sign anything, we measure your actual bathroom and build an AI visualization of the finished design — so you know exactly what you're getting.

Bathroom before remodeling
Your Bathroom Today

Measured and photographed by your Project Manager

Bathroom after AI remodeling design
Your Free AI Design

Delivered before you sign a single-page contract

See your actual vanity, tile, and layout — not a generic catalog photo.
Request changes to tile, fixtures, and layout before any work starts.
No cost, no obligation — it's part of every free estimate.
Timeline

How Long Does a Bathroom Remodel Take?

Bathrooms are smaller than kitchens, so most projects move faster — once your design and materials are finalized, we schedule your crew and hold that date.

Fastest
3–5 Days

Shower Remodel

Shower-area remodels — new walls, floor, and fixtures in the same layout — the quickest way to a new-looking bathroom.

Longest
3–4 Weeks

Custom Bathroom

Full gut renovations — moved walls, custom walk-in shower, radiant heat, and fully custom tile & cabinetry.

Your Project Manager gives you a real start-to-finish timeline before work begins — and holds it, because your crew isn't shared across a backlog of other jobs.

What Happens Next

From First Call to Signed Contract in 3 Steps

No pressure and no obligation. Here is exactly what to expect.

1

Call or send the form

Tell us about the project. We qualify scope and budget by phone first, so there are no surprises later.

2

Free measurement & AI design

Your Project Manager measures your space and builds a free AI design. You adjust it until it is right.

3

Sign a one-page contract

One firm price for the work, one page, a start date. Materials are purchased separately, and we schedule your crew.

Real Projects

Completed Bathrooms

View Full Gallery →
Questions

Bathroom Remodeling FAQ

It depends on scope. Our prices are for the work only: a tub-to-shower conversion starts from $8,000, a hallway, guest or kids bathroom from $14,000, a master bathroom with one wet point from $17,000, and a master with two wet points (shower and tub) from $20,000. The price covers walls, ceiling, flooring, plumbing and insulation. Materials are purchased separately — we book your appointment at our showroom, you choose in one visit, and we invoice you for the materials (or you can order them yourself, online or elsewhere). The starting price is the minimum; your final price depends on scope and location. Shower glass and the vanity top are arranged and priced separately. Your Project Manager gives you a firm number before you sign, not a ballpark that grows later. Buy through us and you get wholesale prices — the lowest available, close to manufacturer pricing.

Bathrooms are smaller than kitchens, so most projects move faster. A shower remodel usually takes 3–5 days. An average bathroom — a full vanity, tile, and shower refresh — runs 1–2 weeks. A custom bathroom with moved walls and a walk-in shower built from scratch can run 3–4 weeks. Your Project Manager gives you a real start-to-finish date before work begins.

If you have more than one bathroom, we plan the work so the others stay usable the whole time. If this is your only bathroom, we'll walk you through the schedule in detail and work with you to minimize the days the plumbing is fully disconnected — most of that window lasts only a few days even on larger projects.

Yes. Removing your old vanity, tub or shower, tile, and flooring, plus hauling away the debris, is built into every bathroom project — it's not an add-on you'll see tacked onto your invoice later.

That's normal, and it's exactly what the free AI visualization is for. We measure your actual bathroom, walk you through tile, vanity, and layout options, and build an AI rendering of the finished space — so you can see it and make changes before anything is ordered, not guess from paint swatches.

Yes to both. We don't lend money ourselves, but we help you get financing — we work closely with banks and lenders and know this process well, so we move fast. Once your financing is in place, we work directly with your lender and handle all the paperwork on our end — usually within one business day. If your bathroom remodel is tied to an insurance claim (such as water damage), we also work directly with insurance companies and adjusters and turn around the documentation they need just as fast.

Why Now

The Best Time to Start Is Before You Need To

A bathroom remodel starts weeks before a single tile comes out — here's what actually drives the calendar.

Crew Calendars Fill First

We run 10+ dedicated crews, and each one is booked as projects are confirmed — not first-come, first-served on the day you want to start. Locking your spot earlier means an earlier start date, not a faster rush job.

Tile & Fixtures Are Ordered, Not Stocked

Custom tile, vanities, and shower systems are built to order once your design is final. Starting the free AI design now is what starts that clock — the remodel itself can't begin until materials are in hand.

Your Estimate Is Locked, Not Floating

Once your Project Manager prices your bathroom from current material and labor costs, that number holds through your 1-page contract — it won't drift upward if you wait to sign.

Plan Around the Holidays, Not Through Them

A bathroom remodel is indoor work, so it isn't weather-dependent — but most families still want it wrapped up before the holidays, which is exactly when the calendar fills fastest.